- starcat
- Archived posts: 18
- Joined: Dec 25, 2017
L3+ power usage to productivity is untenable
The last few weeks leading up to 5 April.18 I am taking note with all other known factors being the same as far as I know, that it taking more watts to run than what the ASIC machines are returning in mined LTC. The math done roughly is in the range of $200.00 USD a month to run 2 of those units 24-7 as far as electricity goes, which is of course not " cheap." This is forcing a change to some kind of alternative or even worse.
Is this due to the current difficulty of mining LTC, and the drop in USD value, or something else?
Is this due to the current difficulty of mining LTC, and the drop in USD value, or something else?